where
N
col
: number of columns in a sheet
timex, y, z
, freqx, y, z
: time-history and frequency sheets of each direction
N
IERS
: number of IERS curves
a
max
: maximum acceleration
g : acceleration of gravity
IERS and RRS have different frequency points, so the layout and range of the Excel sheets must be checked before comparing.
The program finds the frequency and acceleration columns in each sheet and maps which data are compared for each group and direction.
This step prevents comparing the wrong curves.
where
A
n
(f) : ratio of IERS n to the RRS
IERSn
(f) : n-th analysis in-equipment response spectrum
RRS(f) : required response spectrum (linear interpolation)
A
max
: largest ratio over all curves and frequencies
criterion : limit above which the ratio is labeled
IERS (In-Equipment Response Spectrum) is the response spectrum at the location of a component mounted inside the equipment, and it shows the level the component must withstand.
The program compares the analysis IERS with the component RRS on the same frequency axis, calculates the ratio, and labels the ratio where the RRS fails to envelop the IERS.
This ratio is the criterion for judging whether the component qualification is sufficient.
where
r(f) : ratio of analysis IERS to test IERS
IERSA, n
(f) : n-th analysis IERS
IERST
(f) : test IERS
f
p
, r
p
: frequency and ratio of the peak in each band
r
dir
(f
p
) : largest peak ratio of a direction over all groups
Analysis results depend on model assumptions, so they are compared with the IERS measured in testing to confirm the analysis is valid.
The program finds the exceedance ranges from the ratio of the two spectra and compares the peaks in each frequency band.
This shows whether the analysis predicted the actual behavior conservatively.
where
g
p
: required level at the peak frequency
f
p
: peak frequency (broadened by ±15 %)
RRS(f
p
) : existing RRS at the peak frequency
NewRRS(f) : new required response spectrum
1.10 : margin factor
H, V : horizontal and vertical directions
When the existing RRS falls short in some ranges, the RRS for the next test must be redefined.
The program reflects frequency uncertainty with Peak Broadening, applies a margin, and builds the envelope with the existing RRS.
The resulting test input satisfies the required level across the whole range.
This example predicts the qualification test that will be run with the New RRS of step 4. The measured test IERS is multiplied by NewRRS(f) / RRS(f) on a merged frequency axis, while the analysis IERS keeps Target_RRS = RRS. The predicted test IERS envelopes the analysis IERS in every group and direction, with a minimum margin of 1.10 in X, so no ratio label remains.
Return to the AutoPlot Excel to Word Page